Donate using PayPal

Recent photos and other lists

The 36 newest photos

Queueing area for Covid-19 vaccinations - cycle stands temporarily out of use, but there are enough others.

The current state of the Addenbrookes-Trumpington path - you can go down Hering Road and then join the path.

The current state of the Addenbrookes-Trumpington path

The current state of the Addenbrookes-Trumpington path

This footpath (paved but narrow) is the only link from Byron Square to the busway routes

This footpath (paved but narrow) is the only link from Byron Square to the busway routes

This stretch of the fen has been flooded for over a month - there's a free-flowing stream to the right but somehow the cycle path seems to be an impermeable barrier to drainage.

New cycleway closed for further construction.... and being Cambridgeshire, you're either in a car on on a footpath - no recognition of cycling at all. Most cyclists will want to dismount for the kerb to the left.

New cycle contraflow sign following the installation of a modal filter on Panton St.

Already reported, but as it's Pothole Watch Week....

[Image taken 4.3.21] Cycle parking, Broadway, York.

[Image taken 4.3.21] Tier electric hire scooters at former Tang Hall library, off Fifth Avenue. See also #164829. For the list of all sites documented see #164663.

[Image taken 4.3.21] Tier electric hire scooters among Sheffields at former Tang Hall library, off Fifth Avenue. See also #164830. For the list of all sites documented see #164663.

[Image taken 4.3.21] Allen Close, off Alcuin Avenue, York, Tier electric hire scooters. For the list of all sites documented see #164663.

[Image taken 4.3.21] Tier electric hire scooters on Millfield Lane, junction with Hull Road, York opposite Beeswing Ale House. See also #164826. For the list of all sites documented see #164663.

[Image taken 4.3.21] Tier electric hire scooters on Millfield Lane, junction with Hull Road, York. See also #164827. For the list of all sites documented see #164663.

[Image taken 4.3.21] Tier electric hire scooters at the Environment building, Wentworth Way, University of York. For the list of all sites documented see #164663.

Broadway, York, Tier electric hire scooters. For the list of all sites documented see #164663.

[Image taken 4.3.21] York St John, Haxby Road Sports Park, York, Tier electric hire scooters. See also #164821. For the list of all sites documented see #164663.

[Image taken 4.3.21] York St John, Haxby Road Sports Park, York, Tier electric hire scooters. See also # 164821. For the list of all sites documented see #164663.

Hi @lynbrownmp I am one of your constituents and have been left homeless since a car drove into my house and into my brother’s bedroom. Can I speak with you and your office to discuss ASAP? https://t.co/DnMQYBUGGa

The latest development at the Rock Road Rack is yarn bombing.

New cycle and pedestrian bridge to Kingston station

The new Kingston station cycle hub has 450 spaces, but mostly it seems on two-tier racks, alas.

Having coffee at Southbank. I can see 8 @VictoriaPolice waiting to send cyclists who ride over 10 km/h to the Magistrates Court. Not very friendly. Maybe they know they’re damaging their brand. @cityofmelbourne just provide a safe ... [more]

Some time ago I saw a plan that showed a proposed "No Entry except cycles" at Great George Street, but it hasn't happened and the rat-running traffic continues.

The dropped kerb on the right (see #46778) is blocked by van parking, and the stopped up section of road is also covered with indiscriminate parking.

No dropped kerb to join the Colleges Cycle Route at Scott Street.

The southern end of the Garscube Road cycle track still hasn't been completed, but is at least now rideable. Top surface is all that is required. Further north, the path is complete up until Sawmillfield Street, with work in progress at the ... [more]

A cycle link to Kelvinside Avenue from the road at the side of Maryhill Fire Station, and beside it, a footpath to Oban Drive. Another path leaves this to the left, just before the hill, and connects to Kelvinside Drive.

Cut-through between Kelvinside Avenue and the road at the side of Maryhill Fire Station.

[Image taken 2.3.21] Middletons Hotel, Cromwell Road, York, Tier electric hire scooters. For the list of all sites documented see #164663.

[Image taken 2.3.21] York Hospital, Wigginton Road near Fountayne Street roundabout, York, Tier electric hire scooters. For the list of all sites documented see #164663.

[Image taken 2.3.21] Rougier Street, York, Tier electric hire scooters (see also #164735). For the list of all sites documented see #164663.

[Image taken 2.3.21] Rougier Street, York, Tier electric hire scooters (see also #164735). For the list of all sites documented see #164663.

^ Return to top

The 12 most recently modified photos

Who wouldn't drive to the huge multistorey car park when this is the walking/cycling alternative?

Pothole on Merton St [filled by 11 March]

[Image taken 1.3.21] Marygate car park, York, Tier electric hire scooters (https://www.tier.app/tier-selected-as-sole-operator-to-serve-historic-york/) . The scheme launched late October 2020 https://www.yorkpress.co.uk/news/18808900.new- ... [more]

Cycle parking at a new Co-op shop

Cut-through to a crossing of the Cambridge ring road - more use could be made of this.

Tinsel storage area 🤗🎄🤣

Recently constructed covered cycle parking at the Cambridge Professional Development Centre in Trumpington, close to the entrance. This is very welcome provision but outer parts of the facility are unusable as you cannot park a bike betw ... [more]

Recently constructed covered cycle parking at the Cambridge Professional Development Centre in Trumpington, close to the entrance. This is very welcome provision but outer parts of the facility are unusable as you cannot park a bike betw ... [more]

Garret Hostel Lane Bridge

Update: 3.3.21 On 1.3.21 a CYC employee said: "The current space on Micklegate has been provided as a temporary e-scooter parking bay." On 2.3.21 a Tier-employee said: "The intention is for the e-scooter parking to take up a car p ... [more]

[Image taken 2.3.21] York. Poster displaying guidelines for "driving" Tier electric hire scooters located at parking bay. For a list of all sites documented see #164663.

[Image taken 1.3.21] York Art Gallery, Exhibition Square, York, Tier electric hire scooters. For a list of all sites documented see #164663

^ Return to top

Recent placeholders

^ Return to top

  • Icon 164834 There is No Entry for cars travelling South at this point but it is not a one way street. At the moment cyclists have to get off their bikes and walk over a section of pavement to enter the restricted area. It would be easy to design cycle access while continuing to prevent car access.
  • Icon 164833 No pavement on Kings Head side of road with front doors opening directly on to the road. There should be a single track road with priority to vehicles coming up the hill to reduce vehicle emissions.
  • Icon 164832 Reduce speed limit to 30 mph in both directions and on the Marks Tey bound lane make it a single carriageway. This would enable a two way segregated cycle track to the station.
  • Icon 164823 Busy road towards Marks Tey train station from the surrounding Stanway residential area, with a number of pinch points on it. Regularly get very close passes along the whole length of the road. Ideally needs protected cycle lanes installed to make a safe route from the residential area to Marks Tey train station to encourage use of the newly expanded cycle storage facilities.
  • Icon 164819 Fit dropped kerb to enable cyclists to access path to Goldstone estate
  • Icon 164818 Complete the cycle way from Mt Pleasant Lane to Tesco. Needs space from road traffic over this bridge, which is underused normally so available.
  • Icon 164813 Remove accessibility ♿ barriers on shared use path to allow access for cargo bike and trailers.
  • Icon 164812 Add cycle route/pavement along A38
  • Icon 164811 Add cycle route/pavement along A38
  • Icon 164810 Add cycle route/pavement along A38
  • Icon 164809 Add cycle route/pavement along A38
  • Icon 164808 Add cycle route/pavement along A38

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://leyburn.cyclestreets.net/photomap/recent/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.